SECTOR FOCUS
The group’s capabilities have been refined
to deliver comprehensive infrastructure
solutions with high potential.
The next few spreads outline the group’s
capabilities in its target sectors. |
-
MINING

| |
 |
Multi-disciplinary international mine and
process plant constructor |
 |
Consortium partner in engineer, procure
and construct (EPC) mine construction |
 |
Contract crushing and hauling services |
 |
On-site services contractor |
 |
Supply chain logistics into remote sites |
|
|
 |
Experienced African mining and process
plant constructor across 20 countries |
 |
Strong repeat business client base |
 |
Reputation for delivery of complex
contracts in remote and difficult conditions |
|
 |
|
 |
|
 |
|
 |
|
 |

Kinsevere –
Democratic Republic of Congo
The structural, mechanical,
electrical, instrumentation and
piping (SMEIP) supply, construct
and commissioning of a copper
plant to produce 60 000 tonnes
per annum grade A copper.
A site crew of 500 people
achieved 1,35 million lost time
injury free hours to complete
the contract. |
|
Kayelekera uranium
contract – Malawi
Erection of piping, structural
and mechanical equipment,
heavy lifts and electrical and
instrumentation works. The
plant consisted of 1 168 tonnes
of steelwork, 711 tonnes of
plate work, 27 kilometres of
piping and 52 site-fabricated
tanks. |
|
Tenke Fungurume
mining contract –
Democratic Republic of Congo
Supply, fabrication and
installation of structural steel,
platework, piping, electrical
cabling and instrumentation,
as well as installation of
mechanical equipment. |
|
Bogoso sulphide expansion
contract – Ghana
This brownfields project to
increase output was the largest
BIOX plant constructed at the
date of completion. |
|
Langer Heinrich uranium
contract – Malawi
Supply of 2 100 tonnes of
tanking plate work, 4 414
tonnes of steelwork and 1 312
pieces of free issue mechanical
equipment. |
CASE STUDY
Group Five Projects and DRA, a South African
mining process design group, is involved in this
R480 million engineer, procure and construct
(EPC) contract for AngloGold Ashanti’s process
plant and related infrastructure at its open-cast
gold mining operations.
Due to Group Five’s local presence in Ghana since 1996, the
group could ensure the availability of local skills and plant
when the contract was awarded. The team was therefore able
to start on time in March 2010 and expects to hand over to
the client ahead of the contract deadline. Group Five is
leading the logistics for the contract and controlled the
shipping of items from Canada, China, Brazil, South Africa,
Germany, Korea, Thailand, USA and Australia. With the
group’s logistics experience, materials were cleared from
the port in record time so that port demurrage charges
were minimised.
The access road from the port was in a very poor condition
when the mill was due to be transported to site. The Group
Five team repaired the public road to ensure that the mill
shells could be safely transported to site.
During the contract, 125 000 cubic metres of earthworks
have been moved and 6 500 cubic metres of concrete and
1 100 tonnes of steel used. Platinum awards in safety,
quality and project lifecycle audits have been achieved. |
-
INDUSTRIAL

| |
 |
Multi-disciplinary industrial plant
constructor |
 |
Factory layout design and build |
 |
Construction services, including civils
and building works |
 |
Resident multi-disciplinary maintenance
and shutdown services contractor |
 |
Supply of construction materials |
|
|
 |
Track record in civils, heavy mechanical,
electrical and piping construction
| – |
Aluminium, steel, zinc and gold smelting |
| – |
Gold process plants |
| – |
Petrochemical |
| – |
Oil and gas |
| – |
Sugar |
| – |
Paper |
| – |
Cement |
|
|
 |
|
 |
|
 |
|
 |
|
 |

Sasol FT wax expansion –
South Africa
Demolition of existing
structures and the rerouting of
services. Construction of bulk
earthworks, access roads,
underground drainage works,
structural foundations and
building extensions. |
|
Matola cement mill –
Mozambique
Demolition of the existing
concrete structures,
constructing of new civil
structures, installation of mill
and associated items,
structural steel, mechanical
items and piping. |
|
Emirates Aluminium
Smelter – UAE
Six packages ranging from a
power plant and sub-station
building to an anode bake
furnace. We also constructed
materials handling
infrastructure. |
|
Highveld induction furnace –
South Africa
Installation of a furnace and
the supply of structural steel,
handrailing, grating, piping and
electrical and instrumentation
works. |
|
Mittal stockhouse –
South Africa
Installation and commissioning
of
1 761 tonnes of structural
steelwork, 440 tonnes of
mechanical items,
56 tonnes
of grating and hand railing, 404
tonnes of lining, 9 087 tonnes
of sheeting and 44 tonnes of
associated equipment. |
| CASE STUDY
This R105 million brownfields contract for
Cimentos de Mozambique started in March 2010
and involved mechanical, structural, electrical,
civil and piling works. Group Five Projects worked
in joint venture with two sub-contractors on this
contract. This is a repeat client.

The contract involved major demolition works on very old
concrete structures, including two 45-metre chimneys, all
very close to the operating plant. This required the team to
work extremely carefully to ensure that safety and production
was not compromised.
The piling work was particularly challenging as the group
worked from a platform very close to the sea level, with tides
having to be accounted for. The civil works involved
approximately 1 400 cubes of concrete which required an
extremely high degree of accuracy.
The 130 tonne mill was installed in December 2010
after which the rest of the process equipment and
structural steel for the 43 metre high building was fitted.
The group finished the contract without any labour disputes.
The group managed the logistics on this contract, ensuring
that materials were speedily cleared through customs for
both road transport from South Africa and from the port of
Maputo for the heavy mill and associated equipment sourced
from Europe.
Although numerous technical challenges were encountered
due to amendments in design specification, the contract was
handed over to the client after 13 months. |
-
POWER

| |
 |
Power plant co-developer, equity
participant and turnkey design and build
contractor |
 |
EPC for thermal, liquid and gas power
plants |
 |
Solar, wind and mini hydro power plant
contractor |
 |
Construction services in all disciplines |
 |
Supply of construction materials |
|
|
 |
Dedicated power division within
Engineering |
 |
Track record in engineer, procure and
construct (EPC) power plant delivery
in Africa |
 |
Approved EPC contractor to General
Electric (GE) and other technology
providers |
 |
Capability to co-develop contracts
to bankability |
 |
Capability to execute across Africa
and Middle East |
|
 |
|
 |
|
 |
|
 |
|
 |

Kusile power station –
South Africa
Construction of site-wide civil
works for a coal-fired power
station using flue gas
desulpherisation technology. |
|
Sasol OCGT contract –
South Africa
Engineer, procure, construct
and commission, including
performance testing the open
cycle gas turbines as part of
the Combined Cycle Power
Generation Project at Secunda. |
|
Orapa Botswana IPP –
Botswana
Engineering and design work,
including conceptual works, as
well as the procurement of two
GE LM6 000 gas turbines. |
|
Aba power station –
Nigeria
Design, supply and installation
of three gas turbines, with a
combined output of 120
megawatt for the Aba power
station. |
|
Ibom gas-fired power station –
Nigeria
A multi-disciplinary contract
for the design, supply and
construction of a gas-fired
power plant. |
| CASE STUDY
Group Five Engineering and Construction (E+C) was
appointed in 2008 to design and build a power plant
and install two 9E cycle gas turbines at Sasol’s
Secunda petrochemical plant in Mpumalanga. It
worked together with Group Five Projects, Civil
Engineering and Housing during this contract.
The two 120 megawatt turbines are the first privately-owned
gas-fired units of its size in South Africa.
During the construction of the first phase, Sasol extended
Group Five’s scope of work to include the design, procurement,
logistics, construction, installation and commissioning of two
heat recovery steam generation (HRSG) boilers. The addition of
the HRSGs enabled the exhaust gas heat from the turbines to
be used to produce steam, which can be used in the Sasol
manufacturing process.
The installation of the HRSG units involved working alongside
an operating plant whilst ensuring safety to employees and
preventing damage to the operating turbines. Group Five
handled the logistics of shipping the various components from
global factories, as well as the planning of the heavy lifts on
site in a very constricted construction area. No lost time
injuries were experienced.
The successful completion of this first major gas-fired
combined cycle power plant illustrates that Group Five can
undertake and successfully complete total EPC contracts
by making use of the combined skills of its various business
units and packaging them to offer an integrated solution
to clients. |
-
OIL AND GAS

| |
 |
Multi-disciplinary plant and infrastructure
constructor |
 |
Resident multi-disciplinary services
contractor |
 |
Refinery shutdown and turnaround
contractor |
|
|
 |
Dedicated oil and gas business within
Engineering |
 |
Experienced shutdown and maintenance
contractor to all oil and petrochemical
majors |
 |
Dedicated piping and steel fabrication
facilities in line with ISO 3834 standards |
 |
Tankage and pipeline technology
constructor and services |
|
 |
|
 |
|
 |
|
 |
|
 |

Sasol Alrode tanks –
South Africa
Construction of a new fuel
storage facility for Sasol in
Johannesburg using tank
technology from HMT, our
US-based liquid storage
tank partner. |
|
NMPP pipeline –
South Africa
New multi-products pipeline
designed to convey various
petroleum products between
Durban and Johannesburg. |
|
Engen maintenance
shutdown –
South Africa
Planned plant maintenance
and repair. |
|
Chevron maintenance
shutdown –
South Africa
Planned plant maintenance
and repair |
|
Cabinda gas plant –
Angola
Earthworks and piling concrete
work for a new gas plant. |
| CASE STUDY
Group Five is working in partnership with
Spiecapag of France to build a new multi-products
610 mm diameter pipeline from KwaZulu-Natal to
Gauteng for Transnet.
In addition to the pipeline, Group Five is the sole contractor
of associated pump stations along the pipeline, the
construction of the terminals, valve network control blocks
and other separately defined packages, as well as storage
tanks and associated facilities in partnership with HMT, the
group’s US tankage partner. The combined value constitutes
one of the largest construction contracts undertaken by
Group Five.
Works on the contract started in May 2008. Group Five
Coastal, Civil Engineering, Projects and the Oil and Gas
business unit within Engineering and Construction (E+C)
are involved in these contracts.
Pipeline
The pipeline is in its final stages before being commissioned
along with the pump stations in September 2011. The pipeline
involved a high-speed cross-country pipe laying method
unfamiliar to South Africa.
Terminal 1 and pump stations
Construction of the five pump stations started as heavy civil
construction contracts and will finish with the erection of
major equipment and ancillary piping and electrical services.
Although a late design change created significant pressure
on the schedule, the contract is on track for completion in
October 2011. The pump stations have achieved 1 million lost
time injury-free hours.
Terminal 2
Group Five begun construction in March 2010 and is on track
for the scheduled completion in July 2012. The contract
requires multi-disciplinary expertise involving civil, building,
mechanical, electrical and instrumentation construction
work. There has been no lost time injury to date. |
-
WATER AND ENVIRONMENT

| |
 |
Multi-disciplinary constructor of bulk water
transport, treatment and storage systems |
 |
Engineer, procure and construct (EPC)
delivery of bulk water systems |
 |
Design and manufacture of large bore
spiral wound water pipes |
|
|
 |
More than 35 years’ track record of delivery
in water and marine civils sector, which
includes some of the largest contracts in
the SADC* region |
 |
Dedicated pipe manufacture |
 |
Strong African and Middle East capability |
|
* Southern African Development Community.
 |
|
 |
|
 |
|
 |
|
 |

BG3 pipeline –
South Africa
Group Five Pipe was awarded
Rand Water’s R124 million BG3
pipeline in 2008. It completed
the manufacture, coating and
lining of the entire pipeline
during this year. The pipes
were the largest pipes with the
thinnest walls ever to have
been manufactured by the
group, with new coating and
lining technology used. |
|
Olifantspoort water
treatment works –
South Africa
Extension of existing water
treatment works for Polokwane
to increase capacity by 20
megalitres per day. |
|
Vresap pipeline –
South Africa
Supply and installation of
126 kilometres of pipeline
as a water supply system for
Sasol between the Vaal dam
and Secunda. |
|
Berg River dam –
South Africa
65 metres high,
990 metres
long concrete faced rock fill
dam near Franschhoek to
augment water supply to
Cape Town. |
|
Lusip dam –
Swaziland
Construction of three dams,
spillway and off-takes for the
Lubovane irrigation project. |
| CASE STUDY
The Spring Grove dam construction in KwaZulu-
Natal started in April 2011 by the group’s
Civil Engineering and Coastal businesses in
joint venture with Pandev, one of the group’s
long-standing enterprise development partners.
In addition, certain parts of the works have been
sub-contracted to local small and medium entities.
Group Five has sound technical knowledge of dam
construction and the seasonal impact and risks associated
with dam construction. In the 1980s Group Five pioneered
roller compacted concrete technology which allows for
quicker dam construction. The group remains a leader in
this niche market.
The bulk excavation for the foundations of the dam wall is
60% complete, with work on the river bed for the diversion
conduit having started. The foundation preparation for the
intake tower is in progress and temporary access roads
around the site are well advanced. The concrete batch plant
has been erected and is ready for commissioning. The earth
embankment core trench has also been fully excavated and
the concrete aggregates are being crushed using our own
plant and construction materials expertise.
The contract is on track for completion in 2013. |
-
REAL ESTATE

| |
 |
Developer, equity participant and turnkey
design and build contractor in real estate
developments |
 |
Design to build contractor, with particular
green building expertise |
 |
Public private partnerships (PPPs) |
|
|
 |
Design to build capability |
 |
In-house financial structuring capability for
PPP delivery |
 |
Large building capacity and track record |
 |
International delivery capacity |
|
 |
|
 |
|
 |
|
 |
|
 |

Khayelitsha District Hospital –
South Africa
Construction of a new 230-bed
hospital in Cape Town for the
Department of Public Works. |
|
Brandvlei Prison –
South Africa
Demolition of an existing
prison and construction of a
new prison for 1 000 inmates. |
|
Moses Mabhida
soccer stadium –
South Africa
Construction of a
70 000-seater
stadium, including hospitality
boxes, an athletics track,
sports field, basement parking
and external works. |
|
Bank of Tanzania –
Zanzibar
Construction of the
12 000 m2
branch office for the Bank of
Tanzania, comprising a
basement, ground floor and
one tower. |
|
Vodacom VI –
South Africa
The construction of a
15 000 m2
mobile switch centre was an
addition to the Vodacom suite
of buildings. |
| CASE STUDY
Levy Junction is the largest mixed-use
development and the first multi-level retail
development in Zambia. Group Five Building
started this 94 000 m2 development in the capital
of Lusaka in 2009. Delivery date is October 2011.
The R820 million contract consists of a 30 000 m2
double-level retail centre, 25 000 m2 of parking, a
130-bedroom hotel, a
5 000 m2 commercial office block
and the associated external works on parking and
bulk services.
Group Five Building supplied major plant, including tower
cranes, concrete mixing and transportation plant from
South Africa as availability in Zambia is extremely limited.
Over 60 Group Five management members were relocated
to Zambia for the duration of the contract. The safety
performance has been excellent, with no lost time injuries
experienced to date.
On the back of its success with Levy Junction, the group
is currently constructing two other commercial office
developments in Lusaka. Group Five Housing has also started
on a mine accommodation contract for one of the large
mining companies on the copper belt.
To service this country effectively, the group established an
administration office in the capital, with a full suite of support
services. This office, together with our established office in
Chingola on the copper belt, has plant yards for the storage
and servicing of construction materials and equipment. |
-
TRANSPORT

| |
 |
Co-developer, equity participant and
turnkey design and build contractor in
transport concessions |
 |
Engineer, procure and construct (EPC)
delivery of transport infrastructure |
 |
Multi-disciplinary constructor of roads,
railways, ports, harbours and airports |
|
|
 |
International experience across Africa,
Middle East and Europe |
 |
Reputation for timeous and technically
complex delivery |
 |
Large contract capability |
 |
EPC competence |
|
 |
|
 |
|
 |
|
 |
|
 |

Gauteng Freeway Improvement
Project – package E –
South Africa
Extensive lane additions and
improvements to interchanges
as part of SANRAL’s freeway
improvements. |
|
Gauteng Freeway
Improvement Project –
packages A and E –
South Africa
Packages included lane
additions and improvements
to interchanges as part
of SANRAL’s freeway
improvements. |
|
King Shaka
International Airport –
South Africa
Design and construction of an
international airport in
KwaZulu-Natal. |
|
Durban harbour
entrance widening –
South Africa
Durban harbour widening by
100 metres. Removal and
replacement of existing
northern breakwater, extension
of southern breakwater and
deepening of harbour entrance
by three metres to a depth of
19 metres. |
|
Western freeway upgrade
phase 1 –
South Africa
Major upgrade and widening of
a section of freeway between
Khangella and tollgate bridges
in KwaZulu-Natal. |
CASE STUDY
This R650 million contract for the New Doha
International Airport is the first contract for the
group in Qatar in line with its strategy of expanding
its presence in the Middle East outside of Dubai.
The contract forms part of the State of Qatar’s rail
infrastructure system and complements other
major infrastructure developments under
construction in Qatar.
The project management team within our Middle East
business unit has extensive experience in terms of piling,
excavation and “top-down” construction. The construction
method involves the casting of vertical diaphragm walls into
the ground from above and then excavating the material
to create a cavern. The team is working in partnership
with one of the world’s leading piling and diaphragm
wall specialists.
The construction of the sub-terranean station complex
started in January 2010. The station complex represents
roughly 70% of the construction site area and is constrained
on three sides by existing structures. This presents many
access and coordination issues. As the diaphragm wall’s
typical panel is seven metres wide and 1,5 metres thick, very
sophisticated and sizeable items of plant are required during
the enabling works, further complicating the access.
The group has achieved all its milestones on the contract
and has received interest from a number of consultants
and contractors within the region for similar future
contracts. There are more than 60 further sub-terranean
stations planned to be constructed in the State of Qatar.
Group Five believes it is therefore well placed to secure
further contracts. |
|